Build · Cloud and Infrastructure
Cloud Infrastructure and Migration Services
Clouden designs, migrates and operates secure, cost-efficient cloud environments on Microsoft Azure, AWS and Google Cloud, with one team accountable from the first assessment to day-to-day operations.
Microsoft Azure
AWS
Google Cloud
Hybrid cloud
Multi-cloud experience
Azure, AWS and Google Cloud, recommended on fit rather than preference
Architecture-led delivery
An architect owns the design from assessment to cutover
Secure by design
Identity, governance and backup built in from day one
Migration to operations
One team from design through to ongoing management
Why organisations move
When Infrastructure Holds the Business Back
Ageing servers, rising hosting costs and higher security expectations push many organisations towards the cloud. The difficulty lies in moving without disrupting operations, overspending or recreating old problems on a new platform.
Clouden's cloud infrastructure services provide a planned, measurable route from the current estate to a governed cloud environment, with every decision documented and every migration step reversible until it is confirmed.
01
Hardware nearing end of life
Servers and storage due for renewal force a choice between reinvesting on premises and moving workloads to the cloud.
02
Unpredictable cloud costs
Environments that grew without governance carry idle resources, oversized instances and no clear cost ownership.
03
Untested recovery
Backups that have never been restored, and no agreed recovery time, leave critical systems exposed to outages and ransomware.
04
Disconnected locations
Offices, remote teams and back-office operations in different countries work across separate networks and inconsistent access controls.
Services
Cloud Infrastructure Services
Four connected services, available individually or as one programme, that take workloads from on-premises or legacy hosting to a secure, well-governed cloud platform.
01
Cloud Migration
Servers, applications and databases move to Azure, AWS or Google Cloud in planned waves. Each wave is tested, rehearsed and cut over with a rollback plan, so operations continue throughout.
02
Cloud Architecture and Landing Zones
A landing zone is the secure foundation every workload sits on: identity, network design, policies, monitoring and cost controls. Clouden designs it, documents it and builds it as code so it scales with the business.
03
Backup and Disaster Recovery
Critical workloads are protected with backup, replication and documented recovery plans. Recovery is tested against agreed recovery time and recovery point objectives rather than assumed.
04
Hybrid Cloud and Infrastructure Modernisation
Workloads that stay on premises are connected to the cloud under one network, identity and management model, then modernised with containers, automation and infrastructure as code.
Migration journey
Our Cloud Delivery Approach
A four-stage method keeps every cloud migration planned, tested and reversible until each cutover is confirmed. The same team carries the work from the first workload inventory to steady-state operations.
Assess
Workload inventory, dependency mapping and a readiness review, leading to a costed migration business case.
OutputReadiness report and wave planDesign
Target architecture, landing zone and the right approach for each workload: rehost, replatform or modernise.
OutputApproved architecture and runbooksMigrate
Phased waves with rehearsal, testing and a controlled cutover. Each wave is validated before the next begins.
Wave 1Wave 2Wave 3OutputMigrated and validated workloadsOperate
Monitoring, backup, patching and cost optimisation, run by Clouden or handed over to internal IT.
OutputOperating model and documentation
A rollback plan for every wave
Cutover windows agreed with the business
Validation before each sign-off
Documentation handed over at every stage
Scope
What Clouden Delivers
The practical outputs of a cloud programme, from the first assessment to steady-state operations. Each engagement selects the components it needs.
01 · Plan
Readiness and Planning
Workload discovery · Dependency mapping · Migration business case
02 · Foundation
Landing Zones
Identity and access · Network architecture · Governance policies
03 · Move
Migration Execution
Rehost and replatform · Database migration · Cutover and validation
04 · Improve
Modernisation
Containers and serverless · Infrastructure as code · CI/CD pipelines
05 · Protect
Resilience
Backup · Disaster recovery · Business continuity planning
06 · Control
Cost Governance
Rightsizing · Reserved capacity · Cost reporting and budgets
Business benefits
What Changes After Migration
A well-run cloud programme is measured by what the business notices afterwards, not by the number of servers moved.
Costs that are visible and owned
Tagging, budgets and reporting show what each workload costs and who is responsible for it.
Recovery that has been tested
Documented recovery plans, rehearsed against agreed recovery objectives before they are needed.
Secure access from any location
One identity, conditional access and consistent network controls across offices and remote teams.
Capacity that follows demand
Environments scale for growth and scale back when demand falls, without new hardware purchases.
Platforms and tools
Cloud Platforms
Microsoft Azure
Amazon Web Services
Google Cloud
Microsoft Entra ID
[VMware: confirm]
[Terraform: confirm]
Platform names describe delivery experience. They do not indicate formal vendor partnerships or certifications.
Our work
Client Story
Insurance · Cloud Infrastructure · Integration
Unified cloud infrastructure for a GCC InsurTech aggregator operating across the UAE and India
Clouden architected a secure cloud environment connecting the UAE office with back-office operations in India, giving both teams the same systems, access controls and data.
Outcomes
One connected operating environment across two countries
A secure, scalable foundation for growth
Related Build services
Enterprise Applications
Applications and integrations designed to run on the new cloud platform, from enterprise platforms to custom systems.
Data, AI and Automation
Analytics, automation and applied AI built on governed cloud data.
FAQ
Cloud Migration and Infrastructure FAQs
Answers to common questions about Clouden's cloud migration, architecture and infrastructure services.
Microsoft Azure, Amazon Web Services and Google Cloud, including hybrid environments that combine cloud and on-premises infrastructure. Platform recommendations follow an assessment of workloads, skills and budget.
Duration depends on the number of workloads, their dependencies and the migration approach chosen for each. The readiness assessment produces a wave plan with a confirmed timeline before any migration begins.
Workloads move in planned waves. Each wave is rehearsed, cut over during an agreed window and validated against test criteria, with a documented rollback plan ready if a check fails.
Cloud regions are selected to meet the data residency and regulatory requirements of each country of operation. Residency, encryption and access requirements are documented in the target architecture before any data moves.
Yes. Clouden's Managed Cloud and Cost Optimisation service covers monitoring, patching, backup and cost governance. Alternatively, environments are handed over to internal IT with full documentation and runbooks.
Plan Your Cloud Programme
Arrange a conversation with a Clouden cloud architect to review the current environment and agree the right first step, from a readiness assessment to a full migration programme.
Services
© 2026 Clouden. All rights reserved.